The Median Project is rounding the corner. Projects 1 and 2 have been completed, with all trees, plants, and sod/turf removed (the latter task done by the Golf Course). Projects 3 and 4–which replace the irrigation lines and electrical conduit respectively–are half done, in that the old irrigation and electrical components have been removed. PinnAcle Gardening has dug a trench along the length of the median, and new conduit will be installed and buried first, followed by new irrigation lines.
The electrical is set up in such a way to give maximum flexibility for new lighting. An exciting addition to this is the inclusion of outlets, which we can use for beautiful low-voltage holiday lighting.
The trench worked should be completed this week, with boulders coming next. Stay tuned!